Home Projects Urban Planning Study, Post Event City The EXPO-site in Hannover was used for the World Exhibition in 2000. Twelve years later, part of the site is abandoned, while the EXPO pavilions, streets, green spaces, technical infrastructure, and the railway station remain and are costly maintained but barely utilized.
Renovation and Expansion A fallow building on the outskirts of a small spa town needs to be revitalized. In addition to its quality of living, the building was to be designed flexibly so that it could also be converted into an office/administration building in the future.
Restauration / New Building, Stadtmuseum Rapperswil-Jona A modern building mediates between the medieval building parts of the former local museum, whose folded envelope is derived from the openings of the two adjacent existing buildings.
New Building, Library City of Heidenheim Due to its central location in close proximity to the town hall and the Church St. Paul, the municipal library will be closely linked to these two important facilities of the city and communicate with them through its independence.
Bourne House, 3D Laserscaning After a 3D scanning based survey, a point cloud is being generated. On this basis, a 3D model is built and the 2D drawings are created. The generated digital twin can be used for further various applications.
Urban Design, Square Art Museum A redesign of the extensive pedestrian zone "Calea Victoriei" in Bucharest is planned in order to make it more attractive for the community. The forecourt of the art museum, a feature of this square, plays an important role in the planned redesign.
Schilleroper, feasibility study For the past two years, the residents' initiative "Schilleroper" has been attempting to engage in discussions with the government, monument protection agency, and current owners to consider future usage concepts of the abandoned structure.
Renovation Sport Hall, School Lemsahl-Mellingstedt A single-field sports hall has to be energeticaly renovated. As part of this renovation project, the following measures were carried out for the energy renovation of the building envelope and the interior renovation of the annex: Renewal of all windows, Renewal of the sports floor with underfloor heating.